作业帮 > 综合 > 作业

英语翻译虎岭公路隧道初步设计 摘  要 随着经济的快速发展,交通工程已经成为经济发展的强力

来源:学生作业帮 编辑:作业帮 分类:综合作业 时间:2024/05/09 14:21:54
英语翻译
虎岭公路隧道初步设计 摘  要 随着经济的快速发展,交通工程已经成为经济发展的强力驱动与支撑.随着高速公路建设的推进,交通基础设施建设也不断深入,目前隧道工程也已经成为公路系统中的重要组成部分.它对优化道路线形、缩短公路里程有重大影响;同时对促进周边地区环境保护、经济发展及国防建设也具有深远影响.虎岭公路隧道位于陕西省华县境内,属连霍高速公路陕西线西安至潼关段.隧道起点位于虎岭南麓李家沟口处,终点位于虎岭北麓韭菜沟口处,隧道全长1780m.本文对隧道的规划、设计和计算进行了详细的论述.设计的主要内容有:隧道调查,围岩分级、地形与地质调查、气象调查、隧道线型设计、纵、横断面设计,洞口及洞门设计,衬砌结构设计,结构计算,防水与排水、通风设计及运营照明设计.隧道选线时综合考虑了地形地质情况,在衬砌计算中,考虑弹性反力的存在,隧道规划和设计过程中遵循充分发挥隧道功能,安全经济的建设隧道的基本原则,完成整个隧道的初步设计.    最终设计成果包括:设计说明书部分,围岩衬砌计算书,运营通风计算书,运营照明计算书,路线平面图,纵断面设计图,建筑限界及内轮廓图,洞门及明洞设计图,Ⅳ类围岩衬砌设计图,通风机,照明灯具示意图. 关键词:隧道; 结构计算; 衬砌 ; 防排水; 通风;照明
Tiger Mountain Highway Tunnel preliminary design Pick along with the rapid development of economy,traffic engineering has become the powerful driving and supporting economic development.As the highway construction,traffic infrastructure construction also is unceasingly thorough,the tunnel project has become an important part of the highway system.It is to optimize the road alignment,shortened the highway mileage to have the major impact; at the same time to promote the surrounding areas of environmental protection,economic development and national defense construction also has a far-reaching impact.Tiger mountain highway tunnel located in the county of Shaanxi province churchyard,L.Lian Huo freeway line Shaanxi Xi'an to Tongguan.Tunnel starting in the tiger ridge south Li Mizoguchi,at the end of Tiger Hill leek Mizoguchi,tunnel is full-length 1780m.The tunnel plan,design and calculation are discussed in detail.Design of the main contents are:the tunnel surrounding rock classification,survey,topographic and geological survey,meteorological survey,tunnel geometric design,longitudinal,cross-sectional design,portal and portal design,lining structure design,structure calculation,waterproof and drainage,ventilation design and operation of lighting design.Tunnel line selection considering topographical and geological conditions,the lining calculation,considering the elastic force presence,tunnel planning and design process follows the sufficient play tunnel function,safe and economic construction of the basic principles of the tunnel,completed the preliminary design of tunnel.The final design results include:the design specification part,lining calculation,operation ventilation calculation,operation lighting calculations,route plan,profile design,construction clearance and inner contour,portal and the design,type lining design,ventilation,lighting diagram.Key words:tunnel; structure calculation; lining; drainage; ventilation; lighting
英语翻译虎岭公路隧道初步设计 摘  要 随着经济的快速发展,交通工程已经成为经济发展的强力 英语翻译摘 要今年来,随着我国经济的高速发展,民营经济已经成为了我国经济的重要组成部分.但我国民营经济的发展并不是一帆风 英语翻译经济发展与环境保护摘要随着经济的发展,环境问题日益突出,成为制约经济发展的瓶颈.传统观点认为:环境保护与经济发展 英语翻译随着我国经济的快速发展,加快天津滨海新区发展已经成为新世纪国家发展的重要战略,天津滨海新区已经成为我国区域发展的 摘要 随着低碳经济的提出和节能减排的号召,绿色车、节能减排已经成为当今交通工业发展的主旋律.然而,面 英语翻译我国经济发展的过程可以发现,伴随着国有经济结构布局的调整,非公有经济的快速发展,特别是民营企业己经成为经济高速增 英语翻译随着世界经济的发展,经济全球化已经成为了不可逆转的趋势.经济全球化与贸易保护扩大化是一对矛盾,经济全球化促进了发 英语翻译摘 要:随着中国加入WTO以及经济全球化的发展,转变政府职能不但是促进我国经济发展方式转变的需要,同时实现由经济 写作.随着 写作.      随着国际社会的发展,交流的密切,英语作为一门国际语 英语翻译随着现代科学技术的迅猛发展和经济全球化的加强,电子商务成为了不可逆转的经济发展趋势.由此,保证电子商务的安全显得 英语翻译随着经济全球化的发展,人们的生活水平,消费方式有了很大的提高.现代旅游也快速发展,旅游业也已成为了一门支柱产业. 英语翻译内容摘要:随着可持续发展理念的提出与普及,资源开发与利用的可持续性成为了可持续发展理念的重要环节,经济的快速发展