作业帮 > 英语 > 作业

请教:英文达人帮忙翻译,120个词左右就成

来源:学生作业帮 编辑:作业帮 分类:英语作业 时间:2024/05/24 07:31:49
请教:英文达人帮忙翻译,120个词左右就成
麻烦各位英文强人帮忙翻译下面的汉语,尽量华丽点哈~~·不胜感激!
我们做任何事情都会事先做个计划,有了计划能让我们做事做的更加自如,从而达到事半功倍的效果,建筑工程也不例外. 施工进度计划是施工组织设计的中心内容,它要保证建设工程按合同规定的期限交付使用,并且保证工程项目的质量.施工中的其他工作必须围绕着并适应施工进度计划的要求安排.有了施工进度计划,不仅可以保障施工项目的顺利进行,还能够优化整个施工过程.在施工进度计划的工程中,更加方便与管理整个施工过程,从而达到预期的目标.
We should make a plan in advance before anything, with the plan allow us to do things more freely, so as to achieve a multiplier effect, construction is no exception. Construction schedule plan is the centre of the construction organization design, it is to ensure that construction works under the contract delivery period and to ensure project quality. Other work must be centered on the construction schedule to adapt to the requirements of the arrangements. With the construction schedule, not only to protect the smooth progress of the projects, but also can optimize the entire process. In the construction schedule of projects, it's more convenient to manage the entire construction process, so as to achieve the desired objectives.