POINTS NOTED ON CHINA MAKE TRANSFORMER CONTAINER
1.In outgoing feeders control cables are crossing around the terminals.This will obstruct the termination of power cables.
2.Incomer CT sec.cables entering from outgoing feeder transformer it will obstruct the termination of outgoing cable.
3.Cable Screen Earthing connected on both ends it should be one end.
4.There is no R/Y/B color coding for CT secondary cables,PT & MV cables,it should be IEC standard.The present color coding is for ‘R’ phase- yellow,‘Y’ phase- Green & ‘B’ phase- Red marking has been done.
5.12KV insulators are used to connect metering PT cables on 13.8KV side it should be at least 15KV class.
6.PT‘s missing in the metering cubicle.
7.In control cubicle no access for Aux.Transformer maintenance.
8.No specification available for Aux.transformer.
9.No emergency PB provided outside the container in the event of emergency to actuate and trip.
10.There is no metering for outgoing feeders each time to submit total generation,both Trafo incomer meter energy reading has to be summated.