英语翻译where T = duration of construction period from the date

来源:学生作业帮 编辑:作业帮 分类:英语作业 时间:2024/05/28 00:41:55
英语翻译
where T = duration of construction period from the date of possession of site to substantial
completion,in wording days,C = completed cost of project in millions of Australian dollars,
adjusted to constant labor and material prices,K = a constant indicating the general level of time
performance per million Australian dollar,and B = a constant describing how the time
performance is affected by the size of the construction project measured by its cost.
T = 从进场之日开始直至全面竣工之日,即实际工期.
C = 工程总价,以澳元为结算货币,以百万为单位,根据长期人工和材料的价格波动进行调整.
K = 常数,表示工程期间每百万澳元的兑换水平.
B = 常数,表示工程期间受汇率影响的程度,按项目总价进行总体测算.