作业帮 > 英语 > 作业

英语翻译The delta between the notice molar percentage and flowra

来源:学生作业帮 编辑:作业帮 分类:英语作业 时间:2024/05/15 09:19:46
英语翻译
The delta between the notice molar percentage and flowrate setpoint must be coverted in a variation of setpoint to line up the objective to how much measured.
技术要求 Technical Specification
1:图中标高以米为单位,其余均以毫米为单位,自然地坪标高为0.000;
1: Scale heights shown in the figures are unitted as meter, those of the rest are unitted as millimeter, the scale height of the natural ground is 0.000;
2:设计地基承载力>50KN/m2
2: The foundation bearing capacity in the design should be more than 50KN/m2.
3:基地混凝土C25,刚筋Ф为圆钢,W为螺纹钢,基础设100mm厚C10混凝土垫 层
3:
Foundation concret: C25;
Steel Bars: Round steel;
W: screw-thread steel
100mm layer of C10 blinding concrete is set in the foundation.
4:用户应根据当地土壤的承载力,水位情况等对基地进行加固,以防基础下沉过大
4: The users should reinforce their foundations according to the bearing capacity and water level of local soil to prevent over-penetration of the foundations.
5:各承重板中心的相对误差(前后,左右,对角)均要求