4.The supplier’s scope shall be included the supply of main equipment as machines with pre-wired and pre-piped,electrical facilities and engineering for line layout,foundation plan,piping and wiring,etc.from the limited of Take Over Point.
5.Excluding from supplier scope:
(1)All building works such as building construction,lightning,communication facilities,sewage,fire extinguisher,ventilation system for building,lighting system for building,etc.
(2)Structure,sub-structure,maintenance gangway,stair,chimney for equipment.
(3)Supply of electric power source,water,steam,gas,compressed air and other utilities.
(4)Power distributor for transformer,high tension switch gear,low tension power distribution panel and static capacitor,harmonic filter,MCC,AC general constant speed motor.
(5)Erection work and materials for machines,piping,wire,normal cable,anchor bolts,etc.
(6)Interconnecting piping works for pure water,city water,steam,compressed air,gas,etc.from utility section to T.O.P.
(7)Detail design for civil work.
(8)Transportation tools such as forklifts,overhead cranes,coil tongs,coil transfer cart,etc.
(9)Equipment and tools for maintenance shop.
(10)Raw materials and personnels for operation's preliminary trials and acceptance test.
(11)First fill oil such as hydraulic oil,lubricant,grease,etc.
(12)Air conditional for electrical room and control pulpit.
(13)Testing apparatus,tools and measuring instruments in main laboratory.
(14)ITV system for line monitoring
(15)Packing material.
(16)Utility facilities such as waster water plant,cooling tower,power sub-station.
(17)Five (5) sets of Technical Proposal are required to be delivered for discussion.
6.The offering proposal shall be written in English with Metric Unit.All the equipment must itemize to incorporating with the layout drawing.The following document,flow diagram and drawings must be including in the proposal.
(a).Side and plan view LAYOUT drawing for line and auxiliary equipment with dimension showing.
(b).General specification and process description of the mechanical and electrical equipment.
(c).Production table copes with line speed and oven capacity.
(d).Loading cycle table for entry section,exit section.
(e).Unit tension table and map.
(f).Item list with unit weight.
(g).Division list of scope of supply
(h).Functional description for each unit including the reference drawings,schematic diagram for cleaning and furnace section,heat balance diagram,electrical system configuration,etc.
(i).Description and table for automation/semi-auto/manual .
(j).Rolls schedule.
(k).Motor list with sensors list
(l).Design demand for utility parameter as deionized water,cooling water,compressor air,electrical power,gas,etc.and performance guarantee data for production yield,consuming power,cooling water,fuel gas,chemicals,and product quality,etc.
0.4.供应商的范围应包括供应的主要设备,机械,电气设备的pre-wired pre-piped和工程线路布局,扶轮基金会计划、管道、电线等从有限的接管.
5.除从供应商范围:
(1).所有的建筑作品,例如建筑施工、闪电、通讯设备、污水处理、灭火器、通风系统,照明系统的建设为建筑等.
(2).sub-structure结构、维护过道、楼梯、灯罩的设备.
(3).电力供应源、水、蒸汽、燃气、压缩空气和其他基础设施建设.
(四).功率分配器之变压器、高压开关柜、低张力配电板和静态电容器、谐波滤波、马达、AC一般恒速电机.
(五).安装工作、材料、管道、电线、设备正常电缆、锚栓,等等.
(六).连接管道工程为纯净水,城市水、蒸汽、压缩空气、煤气等公用部分T.O.P.从
(七).细节设计为土建工作.
(八).交通工具,如叉车、起重机、线圈钳子、线圈等车,转移.
(九).工具和设备维修店.
(十).原料及人员为行动的初步试验和验收测试.
(十一).首先满足石油如液压油、润滑油、油脂等.
(十二).房间的空调、电气控制讲坛.
(十三).测试设备、工具和测量仪器在主要的实验室.
(14).ITV系统在线监控
(十五).包装材料.
(十六).公用设施,例如污水厂、冷却塔、电力sub-station.
(17).五(5)套技术方案都需要交付的讨论.
6.提供建议应当书面英语和公制单位.所有的设备都详细列明,合并和布局图.下列文件,流程图和图纸必须包括在这个建议.
(一).Side、平面布局绘图线和辅助设备和尺寸.
(b).General规格、工艺说明的机电设备.
(三).Production表对付线路的速度和炉容量.
(d).Loading桌,周期进入出口截面.
(e).Unit张力表和地图.
(f).Item清单.
.Division列表(g)的供应范围
(h).Functional描述每个单元包括参考图纸、图表、清洁和炉截面图、电气系统的热量平衡配置等.
(我).Description桌及自动化/半自动/手册.
(j).Rolls时间表.
(k).Motor列出清单和传感器