英语翻译Technical specifications for blast furnace proper & stov

来源:学生作业帮 编辑:作业帮 分类:英语作业 时间:2024/05/03 04:46:41
英语翻译
Technical specifications for blast furnace proper & stove shell fabrication
Scope of supply:
Scope of supply includes Material procurement ,fabrication,control assembly,inspection,
disassembly after match marking,suitable stiffening&Transportation to the Project Site.
blast furnace shell:
Apprx qty (finished wt) :1050MT
plate thk :40 to 90mm
Material Specification :P355 NH(1.0565) EN 10028 or ASTMA 537CL1
fabrication requirement:
.Plates to have edge preparation at all four sides.
.Plates to have holes for stave fixing as well as stave water connection.these holes are to be
CNC gas cut before plate bending.
.Plate bending for requisite diameter and cone angle.
.Control assembly for individual rings
.When control assembly of two rings (one above another) are complete and accepted by us,
Then bottom ring can be dis-assembled after suitable match marking.
.Dis-assembled ring to be suitably stiffened and transported to site.
.Same has to be repeated for all rings.
Note:
.Pease note that welding of one segment to another or one ring to another ring is not
Included in your scope.
.Analogous drawings are enclosed.
不要软件翻译的 要手工 可以支付宝付款
技术规格及高炉炉壳适当制造
的供应范围:
供应范围包括材料采购、制造、控制大会,检验,
高炉壳:
约在演讲前(完成):小数量1050MT
40到90mm板:这么多
材料的规格:P355尼克-海德菲尔德(1.0565)在537CL1 10028或ASTMA
制造要求:有边准备所有四个侧面.数控气体削减在板弯曲
唉 下面就不会了