作业帮 > 英语 > 作业

装修 材料 类的英译中

来源:学生作业帮 编辑:作业帮 分类:英语作业 时间:2024/05/16 06:55:58
装修 材料 类的英译中
2.Zinc channel mounted 100mmthk partition c/w double layer gypsum board on each side,drywall plaster at joints in bare finishes
3.1200 X 600 X 50mmthk density of 40kg/m3 rockwool insulation within partition
4.a) W10' x Ht8' x 12mmthk fixed tempered glass panel in white spray paint on one side c/w u-channel for Server Rm.
b) W3' x Ht8'x 12mmthk clear tempered swing glass door in white spray paint on one side c/w patch fittings,force spring embedded on ground & stainless steel door handle for Server Rm
5.a) W3' x Ht8' re-con rosewood veneer ply door frame in selected stained finishes
b) W3' x Ht8' re-con rosewood veneer solid-core flush swing door in selected stain finishs c/w hinges,lever handle lockset
6.Fixed glass panel c/w 12mmthk clear tempered glass & re-con rosewood veneer ply in stain finishes
a)W1 1/2'x Ht8' panel
b)W3' x Ht8' panel
7.Semi-concealed wire suspended false ceiling c/w 1'x4' 12mmthk groove-lined mineral fibre lay-in ceiling panel
8.Plaster false ceiling c/w gypsum board,drywall plaste at joints in white emulsion paint finishes
9.L-shaped fiber plaster light holder c/w plaster at joints in emulsion paint finishes
10.W6'* Ht8' 12mmthk tempered clear glass double leaves swing door c/w patch fitting,force spring embedded on ground & stainless steel door handle at Main Entrance
11.Custom-made furniture c/w white pvc on the interior and re-con rosewood veneer ply in stained finishes on the surface
a) L9 1/2 * D2'* Ht8' box-out frame at pantry Area
12.Glass fiber wallpaper c/w emulsion paint finishes for interior concrete walls & both sides of newly constructed partition
13.Electrical Work (Estimated)
a) 60A DP sub-main cable in pvc conduit/trunking from building electrical riser to unit (approx 50m)
b) To dismantle & relocate existing Distribution Box (DB)
c) 10A lighting point & install light fitting supplied by client
d) 13A * 2 double socket outlet phase plate supplied by client
e) 20 pairs telephone cable from existing building riser to unit
f) Telephone cable extension line
g) PC LAN data networking point
h) EXIT lamp c/w back-up battery & wiring work
i) Emergency lamp c/w autocharger & wiring work
j) LEW inspection of site,preparation & drawing of electical single-line diagram for submission to Building Management
14.New air-con ducting c/w flexible duct & metal ventilation grille
15.MAA Submission to FSSB
a) Preliminary check on existing fire protection
b) Site measurement,prepartion & drawing of proposed plan include Professional Engineer's endorsement fees & certification in order to submit plans to FSSB
c) FSSB submission & processing fees
16.2.5kg dry chemical powder fire extinguisher c/w PSB approved label & mounting bracket
2.Zinc在某种路线上移动增加100mmthk分开c是有关清水墙的在最低限度最后部分中连接处给每一方面涂上灰泥的w双倍层石膏板
3.在分开以内40kg/m3 rockwool绝缘情况的3.1200 X600 X50mmthk密度
4.在白色喷头中4.a W10'x Ht8'x 12mmthk固定的钢化玻璃镶板把c//w u-服务器Rm的途径画在一方面上..
c w补丁程序试衣力量春天有关一方面b) W3x Ht8'x12mmthk清楚回火的摆动玻璃门被在为服务器Rm地和不锈钢门柄上把嵌入白色喷头油漆
5.a W3x Ht8侦察在b) W3x Ht8侦察的有选择的沾污的最后部分中红木饰面薄板层门框红木饰面薄板连续除去齐平摆动门的果核被有选择的在中c w给污迹最后部分装上铰链的撬开柄lockset