英语翻译一些工具的不适用也是造成施工进度慢的原因.例如切管机无法切割DN250的镀锌钢管和球墨铸铁管,苏丹当地采购的钻头

来源:学生作业帮 编辑:作业帮 分类:英语作业 时间:2024/05/12 03:38:18
英语翻译
一些工具的不适用也是造成施工进度慢的原因.例如切管机无法切割DN250的镀锌钢管和球墨铸铁管,苏丹当地采购的钻头无法与BOSCH的电锤配合,球墨铸铁管的连接没有专用工具需要现场制作夹具,但是现场缺乏加工工具及材料.一些零星缺件如需要到SAJANA采购还需要一个时间.在等待工具及材料的同时不能及时调整施工人员和工作面,完成无阻碍的工作.现场管理需要发现问题、提出方案并及时解决问题.
It is the reason causing the construction speed to be slow too that some tools are not applicable.For example cut person who in charge of,can't cut zinc-plated steel tube with the intersection of ball and Mexico of DN250,cast iron pipe,bit that the Sudan purchase by locality unable to cooperate with electric hammer of BOSCH,the Chinese ink of ball does not have specific purpose tool that need to make the jig to cast the connection of the iron pipe live,but lack and process tool and material live.Some lack piece sporadicly need,purchase,need first time also to SAJANA.Can't adjust constructors and working range in time while waiting for tool and material,finish the work of hindering.On-the-spot management needs to discover the problems,propose the scheme and solve the problem in time